Since Edison Bai invented the light bulb, our lives have become brighter and more colorful. With the development of science and technology, lighting technology has become more and more advanced and the application of lighting technology has become more and more extensive. Gorgeous stage effects, park lighting effects, urban lighting projects, etc., are all inseparable from lighting technology. The realization of these technologies depends on different types of floodlights.
light source | |
type of light source | LED |
light source | OSRAM/CREE/PHILIPS |
power | 120W(Max)(36PCS) |
Color temperature | RGBW/WHITE |
Lamp | |
size | 262*262*135mm |
Beam angle | 6°~60° |
Lamp body material | ADC12 |
Shade material | 4mm thick high-strength tempered glass |
Protection level | IP66/IK08 |
Operating Voltage | DC 24V or AC 110~277V |
Drive type | Built-in constant voltage or constant current power supply |
Luminous flux | 12350Lm(4000K) |
Power factor | >0.9 |
Control and others | DMX512 |
Lamp life | 35000h |
Lamp outlet | Signal input and output, power supply single input |
Surface treatment | Electrostatic spraying, anti-UV |
Lamp name | LED square flood light |
Lamp model | TX-FS01-L |
Brand | Tianxiang |
Other Products
EXHIBITION
Packing &Shipment
FAQ
Q: Can I have a sample order for lighting pole?
A: Yes, welcome sample order for testing and checking, mixed samples available.
Q: Do you accept OEM/ODM?
A: Yes, we 're factory with standard production lines to fulfill different requirements from our clents.
Q: What about the lead time?
A: Sample needs 3-5 days, bulk order need 1-2 weeks, if quantity more than 1000 sets 2-3 weeks.
Q: How about your MOQ limit?
A: Low MOQ ,1 pc for sample checking available.
Q: How about the delivery?
A: Usually delivery by sea, if urgent order , ship by air available.
Q: Guarantee for the products?
A: Usually 3-10 years for the lighting pole.
Q: Factory or Trade company?
A: Professional factory with 10 years;
Q: How to ship the produt and deliver time?
A: DHL UPS FedEx TNT within 3-5 days; Air transportation within 5-7 days; Sea transportation within 20-40 days.